summaryrefslogtreecommitdiffstats
path: root/docs/breaking_changes.md
diff options
context:
space:
mode:
Diffstat (limited to 'docs/breaking_changes.md')
-rw-r--r--docs/breaking_changes.md19
1 files changed, 10 insertions, 9 deletions
diff --git a/docs/breaking_changes.md b/docs/breaking_changes.md
index 3fed268b98..981512cd4c 100644
--- a/docs/breaking_changes.md
+++ b/docs/breaking_changes.md
@@ -8,6 +8,7 @@ The breaking change period is when we will merge PR's that change QMK in dangero
## What has been included in past Breaking Changes?
+* [2022 May 28](ChangeLog/20220528.md)
* [2022 Feb 26](ChangeLog/20220226.md)
* [2021 Nov 27](ChangeLog/20211127.md)
* [2021 Aug 28](ChangeLog/20210828.md)
@@ -21,17 +22,17 @@ The breaking change period is when we will merge PR's that change QMK in dangero
## When is the next Breaking Change?
-The next Breaking Change is scheduled for May 28, 2022.
+The next Breaking Change is scheduled for August 27, 2022.
### Important Dates
-* [x] 2022 Feb 26 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions.
-* [ ] 2022 Apr 31 - `develop` closed to new PR's.
-* [ ] 2022 Apr 31 - Call for testers.
-* [ ] 2022 May 14 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes
-* [ ] 2022 May 26 - `master` is locked, no PR's merged.
-* [ ] 2022 May 28 - Merge `develop` to `master`.
-* [ ] 2022 May 28 - `master` is unlocked. PR's can be merged again.
+* [x] 2022 May 28 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions.
+* [ ] 2022 Jul 31 - `develop` closed to new PR's.
+* [ ] 2022 Jul 31 - Call for testers.
+* [ ] 2022 Aug 13 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes
+* [ ] 2022 Aug 25 - `master` is locked, no PR's merged.
+* [ ] 2022 Aug 27 - Merge `develop` to `master`.
+* [ ] 2022 Aug 27 - `master` is unlocked. PR's can be merged again.
## What changes will be included?
@@ -42,7 +43,7 @@ If you want your breaking change to be included in this round you need to create
Criteria for acceptance:
* The PR is complete and ready to merge
-* The PR has a ChangeLog file describing the changes under `<qmk_firmware>/docs/Changelog/20220226`.
+* The PR has a ChangeLog file describing the changes under `<qmk_firmware>/docs/Changelog/20220827`.
* This should be in Markdown format, with a name in the format `PR12345.md`, substituting the digits for your PR's ID.
* One strong recommendation that the ChangeLog document matches the PR description on GitHub, so as to ensure traceability.